Planning - Working with the planning - All about tasks - Assign resources

Change of a resource assignment

previous page  main page  next page print this page

The Resource assignment dialog does not allow, when editing a resource assignment, to change the selected resource. To do this, use the easiest resources exchanger. All other settings can make you both in the rebuilding and in the change of a resource allocation. The resource allocation in its default setting dialog looks something like this.

 

A resource assignment dialog

A resource assignment dialog

 

In this dialog, the selected resource is specified above as well as the number of working units of the corresponding resource. With the number of units of work, you can have the same resources, such as identical machines that fulfill the same tasks summarize. If you have created resources with several units of work, you can schedule only a portion of the pooled resource in the respective work units.

 

At the bottom you can for each operation assign a resource, that are selected as the main resource. Their nominal capacity is then given in the table as a requirement of the project process. If you want to select another resource as the main resource, you must first select the appropriate option to remove the current main resource.

 

You can only change the dispatching specifications if you can not make any automatic requirement calculation. In general, it is sufficient for the dispatching specifications to burden the resources equally. This is the case with uniform distribution. Should it be necessary, can also be converted to resource availability and thus the utilization of the resources can be further optimized. There are various options available. Is "only exclusive is dispatched to" selected, the operation with the next scheduling will be moved that the resource is only affected by the operation. Please note, that a termination or other displacement of another project destroy exclusivity again.Should be selected "only coherently is dispatched to", the load is utilized only in a continuous period of time, without having to overload the resources. If this is not achieved, the process is moved.Also, a dispatching up to a certain load. In this case, the burden of the operation is increased to the resource to the specified percentage for each day. If it is necessary in the process is correspondingly lengthened or shortened. Should already cause one or more other processes this level (or higher) load on the resource, the operation will not create more stress on that day, but that does not reduce existing well. However, it may then, that the entire process will be moved. Here it is also possible to use the value from the resource. This type in the Resource Manager in the properties of the resource or resource group load factor in [%] in the field capacity.